Time: Thursday 11 April 2024, 10 a.m. (first date)
1st construction phase: 30 May – 2 June. 2024
2nd construction phase: 30 July – 2.8. 2024
Room: Lehmbaugarten Seffent, Schurzelterstr. 35
Lecturers: Prof. Axel Sowa, Prof.em. Speidel and Tatsuya Tokura
Next to the RWTH shock wave laboratory, there has been a park for 40 years in which clay domes and half-timbered pavilions are built by students by hand and foot without machines. These are improvisations that arise from the joint work of four students at a time. Building: The task is to construct a small half-timbered building, which will be filled with wicker rods and covered with clay. Clay raw walls are created, which must dry before the next step. Plastering: In a second part of the seminar, the raw walls are given different surfaces with clay, lime and mixed plasters; they can be coarse or fine, matt or glossy, monochrome or multi-coloured. The main models are Japanese plasters. They are produced with Japanese trowels. A Japanese master craftsman will once again guide the work this year.